About this position
Boom is building supersonic jet engines out of nickel superalloys - some of the most demanding metals in aerospace - and we're bringing casting capability in-house. Our first casting capability is currently being installed and activated and this role immediately engages as a key participant during commissioning and then leads the hands-on portion of the first pour.
The rarest kind of foundry job
At an established foundry, you inherit the furnace, the procedures, the interlocks, and the layout - all of it decided years before you arrived. You run the standard, and the interesting decisions belong to someone else.
This is not that job.
At Boom you'll be in the room while a casting unit is still lines on a drawing - reviewing equipment specs and cell layouts, catching the safety and process problems before they get built, running utility tie-ins, rigging furnaces into place, and writing the first melt procedures. Then you'll be the one making the first heats. The unit will pour the way you built it to.
What you'll do
Guide the buildout of Boom's casting unit from concept to first heat: layout and spec reviews, vendor engagement, installation, commissioning, and shakedown
Bring hot-metal judgment to design decisions: crucible and refractory practice, mold handling and preheat, pour practice, charge handling and moisture control
Turn wrenches: rig and set equipment, run utility tie-ins with facilities - power, cooling water, compressed air, vacuum, inert gas - assemble, align, leak-check, and shake down
Own safety foresight: identify water/molten-metal interfaces and other hazards at the drawing stage; help specify interlocks, containment, and emergency response for the cell
Write and validate the unit's first melt and pour procedures, maintenance plans, and spares systems - then improve them
Execute melt and pour operations as the unit comes online, with documentation that survives scrutiny
Work shoulder-to-shoulder with engineers as a peer - flag manufacturing issues early, push back with specifics, and help the team make good decisions
This job is demanding
The procedures you need are first iterations - you'll help us improve them pour over pour. The equipment you'll run is complex but it is the same equipment you just helped commission and test. The metal you'll pour is unforgiving of moisture, contamination, and shortcuts, so your experience and judgement are key inputs to help the team produce high quality parts safely. This team loves feedback and if a layout, spec, or design is going to cause a manufacturing problem we want to hear it early and often so we can solve it together.
You probably have
5+ years of hands-on foundry or melt shop experience, including personally melting and pouring heats
High-melt alloy experience - nickel or cobalt superalloys, steels, or titanium; vacuum melting (VIM) experience is a strong plus
Real mechanical craft: tools, rigging, alignment, assembly, and preventive maintenance ownership
Working fluency in the utilities that feed a furnace: electrical power and controls, cooling water, compressed air, vacuum systems, and inert gas
Deep, specific molten-metal safety knowledge - especially the water/molten-metal hazard and how to design and operate against it
Experience installing, rebuilding, or commissioning furnace or casting equipment
Proven ability to communicate equally well with engineers and technicians alike and robust documentation habits that would survive an audit of melts and pours.
It would be great if you have
Investment casting exposure: shell handling, dewax, mold preheat, and mold handling at temperature
Vacuum systems depth: leak detection, pump rebuilds, gauging and interlocks
Refractory installation or furnace rebuild/reline experience
Experience in an AS9100/NADCAP aerospace environment
Crane, rigging, or forklift certifications; formal electrical, millwright, or maintenance training
Experience on a greenfield buildout, line relocation, or major capacity installation
Experience in an R&D, prototype, or startup-pace environment
Why Boom
Boom's engines are being designed, built, and tested under one roof - and the casting unit that pours their hottest parts is about to be built the same way. There is no version of this role at an established foundry where a technician's judgment shapes the cell itself: the layout, the safety basis, the procedures, and the first heat all carry your fingerprints, and the parts poured there will fly.
Compensation
The Base Rate for this position is $35- $46 per hour. Actual rate will vary based on factors including but not limited to location, experience, and performance. The range listed is just one component of Boom’s total rewards package for employees. Other rewards may include long term incentives/equity, a flexible PTO policy, and many other progressive benefits.
There is no set deadline to apply for this job opportunity. Applications will be accepted on an ongoing basis until the search is no longer active.
To conform to U.S. Government aerospace technology export regulations (ITAR and EAR), applicant must be a U.S. citizen, lawful permanent resident of the U.S., protected individual as defined by 8 U.S.C 1324b(a)(3), or eligible to obtain the required authorizations from the U.S. Department of State.
Learn more about ITAR here.
Boom is an equal opportunity employer, including for individuals with disabilities and protected veterans. We are building a culture of merit and excellence.
#J-18808-Ljbffr

Casting Technician
Boom Technology, Inc. · Centennial, CO, USA ·
- Pay:
- $35-$46/hr
- Job type:
- Full Time