Pacific Pros
Sr. Construction Scheduler (Level III)
Pacific Pros, Los Angeles, California, United States, 90079
Benefits
Paid Holidays
401(k) matching
Dental insurance
Health insurance
Paid time off
Vision insurance
Pacific Pros is seeking a
Construction Scheduler III
for
Construction Projects
to represent Los Angeles World Airport (LAWA). The candidate will be responsible for developing and maintaining detailed construction planning schedules for new construction and renovation work as part of the Terminal Development & Improvement Program.
Work Location LAWA has required the candidates be local for this position.
Region Los Angeles, CA
Status Full-time on-site.
Opening Winter 2024, Immediate
Position Description Summary Participate as an integral member of an owner’s program and project controls team, being directly responsible for scheduling multiple, interdependent projects of a large scale ($100m+ in value). Work collaboratively with other elements of the owner’s team, including project managers, construction managers, other controls discipline leads, and claims staff to monitor, report on, and negotiate issues on assigned projects. Review designer and contractor submitted schedules and perform analysis as needed. Provide owner with objective assessments of schedule delays (using Time Impact Analysis or other means), present summary and detailed findings to owner and/or third parties as needed.
Essential Job Duties For This Position
Review Contractor’s Baseline Construction Schedule for conformance with the Plans and Specification, ensuring proper WBS breakdown, sequencing, critical path and logic ties, and inclusion of all activities, resource loading, etc. necessary for approval.
Perform and coordinate constructability review on Contractor’s Baseline Schedule submittal and identify any missing activities, float sequestering or suppression techniques/issues or any other conflicts or shortcomings.
Ensure that project WBS are properly coded and resource loaded.
Provide written evaluation, comments and responses on Baseline Schedule submittal.
Review Contractor’s Monthly Schedule updates in conformance with the plans and specification and identifying any logic changes or inaccurate progress reporting, critical path changes or other pertinent items necessary.
Identify variations from the plan and analyses and report on the cause of the variations.
Review construction progress and inspection reports and maintain an accurate “as built” schedule for use during construction and for evaluation of Contractor’s Monthly Schedule updates and any Time Impact Analysis (TIA) submittal.
Attend weekly construction meeting and monitor 3 Week Look Ahead Schedules for accuracy and identify any inconsistency with Baseline/Schedule updates. Promptly report schedule slippage, other unsatisfactory performance or other variances.
Identify any critical path changes or near critical path changes that could impact individual phase, milestones or project duration.
Provide written response and approval recommendation submittal response.
Coordinate schedule comments and corrections with Contractors.
Address schedule deficiencies.
Maintain a Owner shadow Schedule identifying actual construction activities dates from various sources including daily inspection and quality control reports, site visits, etc. Project and identify potential delays or schedule adjustments based upon Owner Schedule and utilize to assist in evaluating the Contractor’s Monthly Schedule updates.
Review Time Impact Analysis (TIA) submitted by the Contractor and provide written responses, evaluation and recommendation for time extension as appropriate. Identify schedule variances and opportunities and proactively develop mitigation strategies for the Project Management team.
Provide LAWA “What if” schedule impacts for contemplated additional work, potential re-sequencing of phases or construction activities. Evaluate, and forecast project status against an established baseline schedule. Assess the impact of project milestones and report status to Management in order to mitigate project overruns and schedule slippage.
Provide direct scheduling related support on multiple projects on reporting to multiple Project Managers.
Maintain master schedule system to track project interfaces for time frame impacts to electrical airfield systems, mechanical systems, airfield operations and other aviation related disciplines and projects.
Provide development and analysis of man‑hour resources, equipment resources and cost loaded, time‑phased schedules.
Prepare detailed plans; time‑scaled charts, diagrams and track various quantities to measure construction performance.
Maintain simplified logic schedules to highlight status of key interfaces for critical path review.
Provide progress reporting documents and briefing materials as required. Develop creative reporting tools to communicate complex project sequencing and/or progress assessments.
Participate and review with third‑party schedulers to address and provide written comments.
Analyze and assess project milestones and report the fiscal impact and risk to Management.
Contribute to the advancement of PDG’s goals through commitment to productive collaboration with all stakeholders and in development of planning and design schedules.
Support overlapping project scheduling tasks, issue management, meeting facilitation, document control and monthly status reporting to the Project Management Team.
Hardware/Software Knowledge
Mastery of Oracle Primavera P6 Version 8.3 or higher.
Experience with Microsoft Office Suite software – Word, Excel, PowerPoint, and Outlook.
Knowledge of Prolog and other Project Management Systems is preferred.
Experience with Adobe Acrobat.
Knowledgeable of presenting graphical data as related to scheduling.
Use of other related software tools such as Schedule Analyzer, MS Project, Claim Digger, etc.
Required Qualifications
US Employment Authorization without needing sponsorship
Excellent written and oral communication skills
A valid Driver’s License and compliance with PACIFIC’s Vehicle Policy
Proficiency with common Microsoft Office Applications (Word, Excel, PowerPoint and Outlook), SharePoint and Adobe Acrobat (PDF files)
10 years or more of scheduling experience with 5+ years in direct support of an active construction project
Demonstrated experience scheduling the design and construction of large‑scale, complex projects including developing and managing a progress reporting methodology for multi‑million‑dollar construction projects within the range of $30M – $150M.
Requires knowledge and experience of Project Management principles and Project Control Cycles.
Must be capable of reporting earned value performance measurement techniques.
Understanding of critical path method (CPM) scheduling techniques and principles, including ability to handle and prioritize multiple projects concurrently.
Must be able to track field progress weekly in reporting Contractor’s performance.
Developed reporting tools to communicate complex project sequencing and/or progress assessments.
Worked in a master schedule/sub project system environment including programs in determining progress impacts.
Must possess capability to report on all levels of project schedules, quality, monitor project progress, risk and ensure project milestones are met.
Demonstrated experience in working and reviewing third‑party design and/or construction schedules and addressing comments.
Must clearly and concisely be capable of presenting project trends, risks and forecast performance reports to management and to make recommendations on strategies and mitigation measures to resolve project issues.
Demonstrated success on the job, as evidenced by satisfactory performance, acceptance of responsibility, and growth in previous position(s).
Proven accuracy, reliability and completeness in job accomplishment.
Self‑starter with results‑driven focus and ability to work with others.
Education/Training
A Bachelor’s degree in Engineering, Construction Management or related field is preferred.
Registration/Certification
Planning and Scheduling Professional (PSP) certification is preferred.
Element‑Specific Requirements/Notes
Aviation experience preferred.
May assume other duties as required/needed.
Be required to work past regular work shift.
Be required to work various shifts as needed.
This position offers a hybrid/telework schedule per LAWA’s current Pilot Telework Policy for details; however, LAWA has required the candidates be local for this position.
#J-18808-Ljbffr
Paid Holidays
401(k) matching
Dental insurance
Health insurance
Paid time off
Vision insurance
Pacific Pros is seeking a
Construction Scheduler III
for
Construction Projects
to represent Los Angeles World Airport (LAWA). The candidate will be responsible for developing and maintaining detailed construction planning schedules for new construction and renovation work as part of the Terminal Development & Improvement Program.
Work Location LAWA has required the candidates be local for this position.
Region Los Angeles, CA
Status Full-time on-site.
Opening Winter 2024, Immediate
Position Description Summary Participate as an integral member of an owner’s program and project controls team, being directly responsible for scheduling multiple, interdependent projects of a large scale ($100m+ in value). Work collaboratively with other elements of the owner’s team, including project managers, construction managers, other controls discipline leads, and claims staff to monitor, report on, and negotiate issues on assigned projects. Review designer and contractor submitted schedules and perform analysis as needed. Provide owner with objective assessments of schedule delays (using Time Impact Analysis or other means), present summary and detailed findings to owner and/or third parties as needed.
Essential Job Duties For This Position
Review Contractor’s Baseline Construction Schedule for conformance with the Plans and Specification, ensuring proper WBS breakdown, sequencing, critical path and logic ties, and inclusion of all activities, resource loading, etc. necessary for approval.
Perform and coordinate constructability review on Contractor’s Baseline Schedule submittal and identify any missing activities, float sequestering or suppression techniques/issues or any other conflicts or shortcomings.
Ensure that project WBS are properly coded and resource loaded.
Provide written evaluation, comments and responses on Baseline Schedule submittal.
Review Contractor’s Monthly Schedule updates in conformance with the plans and specification and identifying any logic changes or inaccurate progress reporting, critical path changes or other pertinent items necessary.
Identify variations from the plan and analyses and report on the cause of the variations.
Review construction progress and inspection reports and maintain an accurate “as built” schedule for use during construction and for evaluation of Contractor’s Monthly Schedule updates and any Time Impact Analysis (TIA) submittal.
Attend weekly construction meeting and monitor 3 Week Look Ahead Schedules for accuracy and identify any inconsistency with Baseline/Schedule updates. Promptly report schedule slippage, other unsatisfactory performance or other variances.
Identify any critical path changes or near critical path changes that could impact individual phase, milestones or project duration.
Provide written response and approval recommendation submittal response.
Coordinate schedule comments and corrections with Contractors.
Address schedule deficiencies.
Maintain a Owner shadow Schedule identifying actual construction activities dates from various sources including daily inspection and quality control reports, site visits, etc. Project and identify potential delays or schedule adjustments based upon Owner Schedule and utilize to assist in evaluating the Contractor’s Monthly Schedule updates.
Review Time Impact Analysis (TIA) submitted by the Contractor and provide written responses, evaluation and recommendation for time extension as appropriate. Identify schedule variances and opportunities and proactively develop mitigation strategies for the Project Management team.
Provide LAWA “What if” schedule impacts for contemplated additional work, potential re-sequencing of phases or construction activities. Evaluate, and forecast project status against an established baseline schedule. Assess the impact of project milestones and report status to Management in order to mitigate project overruns and schedule slippage.
Provide direct scheduling related support on multiple projects on reporting to multiple Project Managers.
Maintain master schedule system to track project interfaces for time frame impacts to electrical airfield systems, mechanical systems, airfield operations and other aviation related disciplines and projects.
Provide development and analysis of man‑hour resources, equipment resources and cost loaded, time‑phased schedules.
Prepare detailed plans; time‑scaled charts, diagrams and track various quantities to measure construction performance.
Maintain simplified logic schedules to highlight status of key interfaces for critical path review.
Provide progress reporting documents and briefing materials as required. Develop creative reporting tools to communicate complex project sequencing and/or progress assessments.
Participate and review with third‑party schedulers to address and provide written comments.
Analyze and assess project milestones and report the fiscal impact and risk to Management.
Contribute to the advancement of PDG’s goals through commitment to productive collaboration with all stakeholders and in development of planning and design schedules.
Support overlapping project scheduling tasks, issue management, meeting facilitation, document control and monthly status reporting to the Project Management Team.
Hardware/Software Knowledge
Mastery of Oracle Primavera P6 Version 8.3 or higher.
Experience with Microsoft Office Suite software – Word, Excel, PowerPoint, and Outlook.
Knowledge of Prolog and other Project Management Systems is preferred.
Experience with Adobe Acrobat.
Knowledgeable of presenting graphical data as related to scheduling.
Use of other related software tools such as Schedule Analyzer, MS Project, Claim Digger, etc.
Required Qualifications
US Employment Authorization without needing sponsorship
Excellent written and oral communication skills
A valid Driver’s License and compliance with PACIFIC’s Vehicle Policy
Proficiency with common Microsoft Office Applications (Word, Excel, PowerPoint and Outlook), SharePoint and Adobe Acrobat (PDF files)
10 years or more of scheduling experience with 5+ years in direct support of an active construction project
Demonstrated experience scheduling the design and construction of large‑scale, complex projects including developing and managing a progress reporting methodology for multi‑million‑dollar construction projects within the range of $30M – $150M.
Requires knowledge and experience of Project Management principles and Project Control Cycles.
Must be capable of reporting earned value performance measurement techniques.
Understanding of critical path method (CPM) scheduling techniques and principles, including ability to handle and prioritize multiple projects concurrently.
Must be able to track field progress weekly in reporting Contractor’s performance.
Developed reporting tools to communicate complex project sequencing and/or progress assessments.
Worked in a master schedule/sub project system environment including programs in determining progress impacts.
Must possess capability to report on all levels of project schedules, quality, monitor project progress, risk and ensure project milestones are met.
Demonstrated experience in working and reviewing third‑party design and/or construction schedules and addressing comments.
Must clearly and concisely be capable of presenting project trends, risks and forecast performance reports to management and to make recommendations on strategies and mitigation measures to resolve project issues.
Demonstrated success on the job, as evidenced by satisfactory performance, acceptance of responsibility, and growth in previous position(s).
Proven accuracy, reliability and completeness in job accomplishment.
Self‑starter with results‑driven focus and ability to work with others.
Education/Training
A Bachelor’s degree in Engineering, Construction Management or related field is preferred.
Registration/Certification
Planning and Scheduling Professional (PSP) certification is preferred.
Element‑Specific Requirements/Notes
Aviation experience preferred.
May assume other duties as required/needed.
Be required to work past regular work shift.
Be required to work various shifts as needed.
This position offers a hybrid/telework schedule per LAWA’s current Pilot Telework Policy for details; however, LAWA has required the candidates be local for this position.
#J-18808-Ljbffr