Treaty Oak Clean Energy in Austin, Texas is seeking a Director, Transmission and Interconnection to lead interconnection strategy for utility-scale solar and storage projects across ISO markets and vertically integrated systems. Reporting to the VP, this role demands deep industry knowledge and strong cross-functional collaboration.
You will evaluate tariffs, study results, and queue positions; coordinate interconnection requirements; negotiate agreements; and build relationships with utilities
#J-18808-Ljbffr

Director, Transmission & Interconnection — Grid Strategy Lead
Treaty Oak Clean Energy · Austin, TX, USA ·
- Pay:
- 180.000 - 260.000
- Job type:
- Full Time